Line 17 (Beijing Subway)

Line 17 of the Beijing Subway (Chinese: 北京地铁17号线; pinyin: běijīng dìtiě shíqī hàoxiàn) is a rapid transit line under construction in Beijing.[6][7] The line is fully underground with a total length of 49.7 km (30.9 mi).[8] The line is scheduled to open in parts in 2021-2023. It will be operated by Beijing MTR Corporation Limited.[1]

Line 17
 17 
Construction site of Line 17
Overview
Other name(s)M17 / R2 (planned name)
StatusUnder construction
TerminiFuture Science Park North
Jiahuihu
Stations21
Service
TypeRapid transit
SystemBeijing Subway
Operator(s)Beijing MTR Corporation Limited[1]
Rolling stock8-car Type A
History
Planned opening2021 (South)[2]
2023 (North)[3]
Technical
Line length49.7 km (30.9 mi)
Characterunderground[4]
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed100 km/h (62 mph)[5]
Route map

Future Science Park North
Wenyu river
Future Science Park South
Xiejiacun depot
Tiantongyuan East
Qing river
Qingheying
Line 13 crossing
Shuangsha railway crossing
Yongshiying
Beixiao river
line 13 Xizhi Men
Wangjing Xi (W)
line 13 Dongzhi Men
Taiyanggong
outer - inner
Ba river
Xibahe
Sijiqing - Guanzhuangluxikou
connects line 12
Zuojiazhuang
Liangma river
Workers' Stadium
Dongsi Shitiao - Caogezhuang North
connects line 3
Dongdaqiao
Guangqudonglu
Yong'an Li
Tonghui river
Guangqumen Wai
Panjiayuan West
Shilihe
inner - outer
Zhoujiazhuang
Shibalidian
Fengshuang railway
Beishenshu
Tonghui irrigate canal
Ciqu Bei (N)
Ciqu
Ciqu South yard
Jiahuihu

Description

Line 17 is planned to run from the Future Science Park North station in Changping District to Jiahuihu station in Tongzhou District.[9][10] The line is fully underground with a total length of 49.7 km (30.9 mi).[11][10] The expected end to end travel time to be approximately 56 minutes.[12] When complete, the line will provide relief to the congestion on Line 5, Line 10 and Line 13.[12]

Rolling stock

Line 17 train delivered to Dahongmen railway station in May 2021

Line 17 will use 8-car Type A rolling stock.[7]

Planned opening time

SegmentCommencementLengthStation(s)Name
Shilihe — Jiahuihu 2021 (Planned) 16.5 km (10.3 mi)[13] 7 Southern section

Stations

Station Name Connections Distance
km
English Chinese
Future Science Park North 未来科学城北[14]
Future Science Park South 未来科学城南[14]
Tiantongyuan East 天通苑东
Qingheying 清河营
Yongshiying 勇士营
Wangjing Xi (W) 望京西  13   15 
Taiyanggong 太阳宫  10 
Xibahe 西坝河  12 
Zuojiazhuang 左家庄[14]
Workers' Stadium 工人体育场  3 
Dongdaqiao 东大桥  6   28 
Yong'an Li 永安里  1 
Guangqumen Wai 广渠门外  7 
Panjiayuan West 潘家园西
Shilihe 十里河  10   14 
Zhoujiazhuang 周家庄[14]
Shibalidian 十八里店[14]
Beishenshu 北神树
Ciqu Bei (N) 次渠北
Ciqu 次渠  Yizhuang 
Jiahuihu 嘉会湖[15]

History

Project headquarters of Line 17 Dongdaqiao station in March 2017.

In January 2011, an official with the city's planning committee indicated that Line 17 of the subway was planned to run east–west through the city's Central Business District under Guanghua Road with transfers to Lines 4 and 5.[16] However, the line run through Central Business District is known as Line 28 now.

In February 2012, the city's planning committee identified a different Line 17, as a line planned for 2020, that would run north–south from Tiantongyuan to Yizhuang that would run parallel and to the east of Line 5. On June 15, 2012, the city government disclosed tentatively planned stations for the line.[17][9][18][10]

On October 10, 2013, city authorities confirmed that Line 17 would run from the Future Science Park North station in Changping District to Yizhuang Zhanqianqu South station in Tongzhou District.[10] Construction was expected to begin in 2014 and Line 17 would have a total length of 49.7 km (30.9 mi).[10]

Construction of the line began in 2015.[19][20]

References

  1. "确定了!北京地铁17号线,京港地铁公司运营". 2019-12-30.
  2. "北京今年年底预计开通7条(段)地铁 总计约54公里". 2021-02-26.
  3. "地铁17号线北段工程严重滞后". 2021-05-10. Archived from the original on 2021-06-03. Retrieved 2021-05-31.
  4. https://m.thepaper.cn/newsDetail_forward_1875509
  5. "北京地铁17号线南段年底开通". 2021-02-24.
  6. 110. "北京地铁17号线力争年内全线开工 将打造成一体化设计标准示范线-千龙网·中国首都网". beijing.qianlong.com. Retrieved 2018-05-29.CS1 maint: numeric names: authors list (link)
  7. http://news.china.com/domestic/945/20150720/20044694.html
  8. https://m.thepaper.cn/newsDetail_forward_1875509
  9. (Chinese) "北京将再增3条新地铁" 《新京报》 2012-06-16
  10. (Chinese) "北京地铁17号线有望明年开建 从昌平至亦庄" 新京报 Archived 2016-01-07 at the Wayback Machine 2013-10-10
  11. https://m.thepaper.cn/newsDetail_forward_1875509
  12. "17号线2020年开通南北段".
  13. "年底开通六座车站!北京地铁17号线南段铺轨有序推进". 2021-02-23.
  14. "轨道交通17号线、19号线一期、昌平线南延一期工程沿线车站命名预案" (PDF) (in Chinese). Beijing Municipal Commission of Planning and Natural Resources. 2021-07-19. Retrieved 2021-07-20.
  15. "地名公告>嘉会湖站". 2021-11-09. Retrieved 2021-11-09.
  16. (Chinese) Roll.sohu.com "CBD核心区地铁17号线地下步道规模空前" 中证网 2011-01-17
  17. (Chinese) "北京再规划建设3号、12号、R2线三条新地铁线路" 中国质量新闻网 2012-06-16
  18. (Chinese) "北京将再增3条新地铁" 新京报 2012-06-16
  19. "地铁17号线将在2022年底试运行,全程21站". 2019-06-10.