Line 28 (Beijing Subway)
Line 28 of the Beijing Subway (Chinese: 北京地铁28号线; pinyin: běijīng dìtiě èrshíbā hàoxiàn) is a rapid transit line under construction in Beijing. It was formerly known as CBD line.
| Line 28 | |
|---|---|
| 28 | |
![]() Construction site in February 2021 | |
| Overview | |
| Other name(s) | M28 (planned name) CBD line |
| Status | Under construction[1] |
| Locale | Chaoyang district Beijing |
| Termini | Dongdaqiao Guangqudonglu |
| Stations | 9 |
| Service | |
| Type | Rapid Transit |
| System | Beijing Subway |
| Rolling stock | 6-car Type LB |
| Technical | |
| Line length | 8.877 km (Phase 1)[2] |
| Character | Underground |
| Operating speed | 80 km/h[2] |
Construction started in July 2021.[1] It is planned to open in 2025.[3]
List of Stations
| Station Name[4] | Connections | Distance km |
Location | ||
|---|---|---|---|---|---|
| English | Chinese | ||||
| Dongdaqiao | 东大桥 | 6 17 Pinggu | Chaoyang | ||
| Jintai Xizhao | 金台夕照 | 10 Pinggu | |||
| Guanghualu | 光华路 | ||||
| Hexinqu | 核心区 | ||||
| Dawang Lu | 大望路 | 1 14 | |||
| Beijing East railway station | 北京东站 | ||||
| Dajiaoting | 大郊亭 | 7 | |||
| Guangqulu | 广渠路 | ||||
| Guangqudonglu | 广渠东路 | ||||
History
In August 2015, planning authorities proposed an underground automatic people mover (APM) line through the Central Business District (CBD).[5]
According to the most recent plan announced in August 2019, the line will run 8.877 km (5.516 mi), have 9 stations from Dongdaqiao to Guangqudonglu.[2] The line is upgraded to a subway line, not an automatic people mover (APM).[2]
A feasibility study for the line was approved in October 2020.[4]
Construction started in July 2021.[1]
Rolling stock
It will use 6-car Type LB linear motor rolling stock, similar to the Capital Airport Express of Beijing Subway, and Guangzhou Metro's Line 4, Line 5 and Line 6.[1]
References
- "北京地铁28号线首站启动建设". 2021-07-27.
- "北京地铁28号线最新车站方案公布:5座车站可以换乘". 2019-08-20.
- "CBD:京城老牌商务区升级之旅". 2021-01-25. Archived from the original on 2021-03-12. Retrieved 2021-03-12.
该项目已被列入2020年北京市政府重点工程计划,并计划于2025年建成