Orange Line (Namma Metro)
The Orange Line or ORR Line is part of the Namma Metro rail network for the city of Bangalore, Karnataka, India. It consists of two corridors, namely Corridor-I and Corridor-II. It has been planned to be operated by 2028.[1][2]
| Orange Line | |
|---|---|
| Overview | |
| Status | Planned |
| Owner | Bangalore Metro Rail Corporation Limited (BMRCL) |
| Locale | Bangalore, Karnataka, India |
| Termini | JP Nagar IV Phase (JD Mall) Kempapura |
| Stations | 22 (Corridor-I) + 11 (Corridor-II) |
| Website | bmrc.co.in |
| Service | |
| Type | Metro |
| System | Namma Metro |
| Depot(s) | TBD |
| History | |
| Planned opening | 2028 |
| Technical | |
| Line length | 42 km (26 mi) |
| Number of tracks | 2 |
| Character | TBD |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
| Electrification | 750 V DC third rail |
Stations
Corridor-I
The corridor-I of Orange Line is planned to have 22 stations.[1]
| Orange Line 1 | ||||||
|---|---|---|---|---|---|---|
| # | Station Name | Phase | Status | Connections | Layout | |
| English | Kannada | |||||
| 1 | JP Nagar Phase 4 | ಜೆ.ಪಿ. ನಗರ ೪ನೆ ಫೆಸ್ | Phase 3A | Proposed | TBD | |
| 2 | JP Nagar Phase 5 | ಜೆಪಿನಗರ ೫ನೇ ಹಂತ | Phase 3A | Proposed | TBD | |
| 3 | JP Nagar | ಜೆ.ಪಿ. ನಗರ | Phase 3A | Proposed | TBD | |
| 4 | Kadirenahalli | ಕದಿರೇನಹಳ್ಳಿ | Phase 3A | Proposed | TBD | |
| 5 | Kamakya bus Depot | ಕಾಮಾಕ್ಯ ಬಸ್ ನಿಲ್ದಾಣ | Phase 3A | Proposed | TBD | |
| 6 | Hosakerahalli Cross | ಹೊಸಕೆರೆಹಳ್ಳಿ ಕ್ರಾಸ್ | Phase 3A | Proposed | TBD | |
| 7 | PES Institute of Technology | ಪಿ.ಇ.ಎಸ್ ಕಾಲೇಜು | Phase 3A | Proposed | TBD | |
| 8 | Mysuru Road | ಮೈಸೂರು ರಸ್ತೆ | Phase 3A | Proposed | TBD | |
| 9 | Nagarbhavi Circle | ನಾಗರಬಾವಿ ವೃತ್ತ | Phase 3A | Proposed | TBD | |
| 10 | Vinayaka Layout | ವಿನಾಯಕ ಲೇಔಟ್ | Phase 3A | Proposed | TBD | |
| 11 | Ambedkar Institute of Engineering | ಅಂಬೇಡ್ಕರ್ ಇನ್ಸ್ಟಿಟ್ಯೂಟ್ ಆಫ್ ಎಂಜಿನಿಯರಿಂಗ್ | Phase 3A | Proposed | TBD | |
| 12 | BDA Complex | ಬಿ.ಡಿ.ಎ ಕಾಂಪ್ಲೆಕ್ಸ್ | Phase 3A | Proposed | TBD | |
| 13 | Sumanahalli Cross | ಸುಮನಹಳ್ಳಿ ಕ್ರಾಸ್ | Phase 3A | Proposed | TBD | |
| 14 | Chowdeshwari Nagar | ಚೌಡೇಶ್ವರಿನಗರ | Phase 3A | Proposed | TBD | |
| 15 | Freedom Fighters Cross | ಫ್ರೀಡಂ ಫೈಟರ್ಕ್ರಾಸ್ | Phase 3A | Proposed | TBD | |
| 16 | Kanteerava Studio | ಕಂಠೀರವ ಸ್ಟೇಡಿಯಂ | Phase 3A | Proposed | TBD | |
| 17 | Peenya | ಪೀಣ್ಯ | Phase 3A | Proposed | TBD | |
| 18 | Bahubhali Nagar | ಬಾಹುಬಲಿ ನಗರ | Phase 3A | Proposed | TBD | |
| 19 | BEL Circle | ಬಿ.ಇ.ಎಲ್ ವೃತ್ತ | Phase 3A | Proposed | TBD | |
| 20 | Patelappa Layout | ಪಟೇಲಪ್ಪ ಲೇಔಟ್ | Phase 3A | Proposed | TBD | |
| 21 | Hebbal | ಹೆಬ್ಬಾಳ | Phase 3A | Proposed | TBD | |
| 22 | Kempapura | ಕೆಂಪಾಪುರ | Phase 3A | Proposed | TBD | |
Corridor-II
The Corridor-II of Orange line is planned to have 9 stations.[1]
| Orange Line 2 | ||||||
|---|---|---|---|---|---|---|
| # | Station Name | Phase | Status | Connections | Layout | |
| English | Kannada | |||||
| 1 | Hosahalli | ಹೊಸಹಳ್ಳಿ | Phase 3B | Proposed | TBD | |
| 2 | KHB Colony | ಕೆ.ಎಚ್.ಬಿ ಕಾಲೊನಿ | Phase 3B | Proposed | TBD | |
| 3 | Vinayak Nagar | ವಿನಾಯಕ ನಗರ | Phase 3B | Proposed | TBD | |
| 4 | Sumanahalli Cross | ಸುಮನಹಳ್ಳಿ ಕ್ರಾಸ್ | Phase 3B | Proposed | TBD | |
| 5 | Sunkadakatte | ಸುಂಕದಕಟ್ಟೆ | Phase 3B | Proposed | TBD | |
| 6 | Herohalli | ಹಿರೋಹಳ್ಳಿ | Phase 3B | Proposed | TBD | |
| 7 | Byadarahalli | ಬ್ಯಡರಹಳ್ಳಿ | Phase 3B | Proposed | TBD | |
| 8 | Forest Gate | ಫಾರೆಸ್ಟ್ ಗೇಟ್ | Phase 3B | Proposed | TBD | |
| 9 | Kadabagere | ಕಡಬಗೆರೆ | Phase 3B | Proposed | TBD | |
See also
References
- "Bangalore Metro Phase 3 to cover 42 km, have 31 stations". New indian Express. 27 October 2021.
- "42 KMs Bangalore Metro Phase-3 Project will start its operation by 2027-28". Metro Rail News. 27 October 2021.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.