The Silver Line (Line 10) is an under construction line of Delhi Metro which is scheduled to be completed by 2025.[1]
| Silver Line (Line 10) | |
|---|---|
| Overview | |
| Status | Under Construction |
| Owner | Delhi Metro |
| Locale | Delhi |
| Termini | Tughlakabad Delhi Aerocity |
| Stations | 15 , Elevated: 4, Underground: 11 |
| Service | |
| Type | Rapid transit |
| System | Delhi Metro |
| Operator(s) | Delhi Metro Rail Corporation |
| Rolling stock | Hyundai-ROTEM Standard gauge |
| History | |
| Planned opening | 2025 (Phase 4) |
| Technical | |
| Line length | 23.622 km |
| Character | Underground and Elevated |
| Track gauge | Hyundai-ROTEM Standard gauge |
| Electrification | 25 kV, 50 Hz AC through overhead catenary |
This 23.622 km line consists of 15 stations (4 Elevated & 11 Underground) from Tughlakabad to Delhi Aerocity. This Line is a part of Phase 4 of Delhi Metro.[2]
Stations
The stations proposed for the Silver Line are:[2]
| Silver Line | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| No. | Station Name | Phase | Opening | Interchange
Connection |
Station Layout | Platform Level Type | Depot Connection | Depot Layout | |
| English | Hindi | ||||||||
| 1 | Delhi Aerocity | दिल्ली एयरोसिटी | 4 | 2024 | Orange Line IGI Airport |
Underground | Island | None | None |
| 2 | Mahipalpur | महिपालपुर | 4 | 2024 | Underground | Side | None | None | |
| 3 | Vasant Kunj Sector-D | वसंत कुंज सैक्टर-डी | 4 | 2024 | Underground | Side | Vasant Kunj Depot | At Grade | |
| 4 | Kishangarh | किशनगढ़ | 4 | 2024 | Underground | Side | None | None | |
| 5 | Chhatarpur | छत्तरपुर | 4 | 2024 | Yellow Line | Underground | Side | None | None |
| 6 | Chattarpur Mandir | छत्तरपुर मंदिर | 4 | 2024 | Underground | Island | None | None | |
| 7 | IGNOU | इग्नू | 4 | 2024 | Underground | Island | None | None | |
| 8 | Neb Sarai | नेब सराय | 4 | 2024 | Underground | Island | None | None | |
| 9 | Saket G-Block | साकेत जी-ब्लॉक | 4 | 2024 | Elevated | Side | None | None | |
| 10 | Ambedkar Nagar | अम्बेडकर नगर | 4 | 2024 | Elevated | Side | None | None | |
| 11 | Khanpur | खानपुर | 4 | 2024 | Elevated | Side | None | None | |
| 12 | Sangam Vihar | संगम विहार | 4 | 2024 | Elevated | Side | None | None | |
| 13 | Anandmayee Marg | आनंदमयी मार्ग | 4 | 2024 | Underground | Island | None | None | |
| 14 | Tughlakabad Railway Colony | तुगलकाबाद रेलवे कॉलोनी | 4 | 2024 | Underground | Island | None | None | |
| 15 | Tughlakabad | तुगलकाबाद | 4 | 2024 | Violet Line Indian Railways | Underground | Island | None | None |
In November 2020, DMRC changed the alignment of the Silver line as per ASI, The National Monuments Authority's instructions to circumvent the Qutub Minar and more than a hundred other historical structures dotting Mehrauli.[2]
Train Info
| # | Silver Line | |
|---|---|---|
| 1 | Rakes | Hyundai Rotem-BEML |
| 2 | Train Length | 6 |
| 3 | Train Gauge | 4 ft 8 1⁄2 in (1,435 mm) Standard Gauge |
| 4 | Electrification | 25 kV, 50 Hz AC through Overhead Catenary
OHE |
| 5 | Train's Maximum Speed | 100 Km/hr |
| 6 | Train Operation | Delhi Metro |
References
- May 8, Sidharatha Roy / TNN / Updated; 2021; Ist, 13:10. "Work on underground section of Metro's Silver Line to begin soon | Delhi News - Times of India". The Times of India. Retrieved 17 June 2021.CS1 maint: numeric names: authors list (link)
- Dec 2, Sidharatha Roy / TNN / Updated; 2020; Ist, 11:39. "Delhi Metro News: Delhi Metro steers clear of Qutub Minar | Delhi News - Times of India". The Times of India. Retrieved 14 April 2021.CS1 maint: numeric names: authors list (link)