Shenzhen Metro MOVIA EMU

Shenzhen Metro MOVIA EMU is the first electric multiple unit of Shenzhen Metro. It runs on Shenzhen Metro Line 1. 132 cars were ordered, built by Bombardier Transportation and CRRC Changchun Railway Vehicles Co., Ltd..

Shenzhen Metro MOVIA 456 EMU
Interior of MOVIA 456 EMU
In service2004–present
ManufacturerChangchun Bombardier Railway Vehicles (Bombardier Transportation and CNR Changchun)
Built atChangchun
Family nameMOVIA
Constructed2004–2005
Entered service28 December 2004 (2004-12-28)
Number built132
Number in service132
Formation6-car sets
Tc–Mp–M+M–Mp–Tc
Fleet numbers101–122
Operator(s)SZMC (Shenzhen Metro Group)
Depot(s)Zhuzilin, Qianhai
Line(s) served1
Specifications
Car body constructionAluminum alloy
Car length139.98 m (459 ft 3.0 in)
Width3.1 m (10 ft 2.05 in)
Height3,855 mm (12 ft 7.77 in)
Doors5 per side
Maximum speed80 km/h (50 mph)
Weight228 t (224 long tons; 251 short tons)
Traction systemIGBTVVVF (Bombardier MITRAC TC1110)
Traction motors3-phase AC induction motor (Bombardier)
Electric system(s)1,500 V DC (nominal) from overhead catenary
Current collection methodSingle-arm pantograph
Safety system(s)Siemens Mobility Trainguard LZB-700M
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

Features

The model is Movia 456. The Shenzhen Metro Group ordered it in November 2001 for Line 1. The 22 trains each consist of 6 cars. The first train was manufactured by Bombardier in Germany, and arrived in Shenzhen on April 23, 2004. The remaining 21 trains were manufactured in Changchun. Compared with the same type of train for Guangzhou Metro and Shanghai Metro, this train uses Faiveley plug doors to reduce noise.[1]

References

  1. "深圳地铁1号线列车(MOVIA 456)". Trainnets (in Chinese). 2016-02-20.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.