Heung Yuen Wai Control Point

Heung Yuen Wai Control Point (Chinese: 香園圍) is a land border control point at the border at Heung Yuen Wai in North District, New Territories, Hong Kong. Its counterpart across the bordervis Liantang Port (Chinese: 莲塘口岸 in Shenzhen, Guangdong Province. The control point opened for freight trucks on 26 August 2020.[1][2][3]

Heung Yuen Wai Control Point
香園圍管制站
Heung Yuen Wai Control Point under construction in March 2019, view from Hong Kong towards Shenzhen
General information
TypeBorder control
LocationHeung Yuen Wai, New Territories
CountryHong Kong
Coordinates
Opened26 August 2020
Management Customs and Excise Department, Immigration Department
Website
td.gov.hk (Hong Kong)
Coordinates22°33′15″N 114°09′09″E
CrossesFrontier Closed Area
Statistics
TollNo toll
Location
Heung Yuen Wai Control Point
Traditional Chinese香園圍管制站
Cantonese Yalehēung yùhn wàih gún jai jaahm
Jyutpinghoeng1 jyun4 wai4 gun2 zai3 zaam6

Objective

According to the government the border control point (BCP) is needed to relieve the heavily used points (like Lo Wu Control Point) in the western border area, and is to be built between Lo Wu Control Point and Sha Tau Kok Control Point.[4] The plan calls for a joint terminal hall that will be built over the Sham Chun River.

Opening

Its opening was reported in at least one outlet in May 2019 as scheduled for September 2019.[5] Other reports say by the end of 2019. [6]

The opening is further delayed due to the COVID-19 pandemic, as Hong Kong shut down all border crossings with Shenzhen except the Shenzhen Bay Control Point to control the spread.

It was announced on Friday 21 August 2020 that the Control Point is scheduled to open from 4:00pm on Wednesday 26 August 2020 for cross-boundary trucks only.[1]

Closed Area

Like all other immigration control points located along the land border of Hong Kong, Heung Yuen Wai Control Point will lie within the Closed Area. Vehicles other than taxis require a Closed Road Permit to enter.[7]

Transport

A new dual-carriageway access highway, Heung Yuen Wai Highway, was built to link the control point from Fanling Highway,[8] connecting with the Eastern Corridor roadway on the mainland side. The highway comprises viaducts and two tunnels (Cheung Shan Tunnel and Lung Shan Tunnel[8]); the main viaduct was completed on 14 March 2018.[9] The road was expected to open by the end of 2018,[8] but its opening was delayed until 26 May 2019.[10][11]

Liantang Control Point in Shenzhen is further accessible from October 2020 by an extension of Shenzhen metro line 2.[12][13]

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.