Jardim Colonial (São Paulo Metro)
Jardim Colonial is a future monorail station of São Paulo Metro. It will serve Line 15-Silver, which is currently in expansion and will connected the nearby neighbourhood to the Metro Line 2-Green in Vila Prudente. It will be located in Avenida Ragueb Chohfi, 1400.
![]() | |||||||||||
| Location | Av. Ragueb Chohfi, 1400 São Mateus Brazil | ||||||||||
| Owned by | |||||||||||
| Operated by | |||||||||||
| Platforms | Island platform | ||||||||||
| Construction | |||||||||||
| Structure type | Elevated | ||||||||||
| Disabled access | Yes | ||||||||||
| Other information | |||||||||||
| Station code | IGT | ||||||||||
| History | |||||||||||
| Opening | 29 December 2021[1][2] | ||||||||||
| Previous names | Iguatemi | ||||||||||
| Services | |||||||||||
| |||||||||||
Track layout (Line 15) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Toponymy
In 2009, when the line project was publicly presented, the station was temporarily name Iguatemi, district located 1 km (0.62 mi) away from the future station. After toponymic studies, the station was officially named Jardim Colonial, name of the nearest neighbourhood.[3][4]
Station layout
| P Platform level | ||||
| Westbound | ← | |||
| Island platform, doors open on the left | ||||
| Eastbound | ||||
| M | Mezzanine | Fare control, ticket office, customer service, Bilhete Único/BOM recharge machines | ||
| G | Street level | Exit/entrance | ||
References
- "Governo de SP promete entregar estação Jardim Colonial, da linha 15-Prata do monotrilho, em 2 anos" (in Portuguese). G1. 27 May 2019. Retrieved 29 May 2019.
- Meier, Ricardo (14 December 2021). "Estação Jardim Colonial (Linha 15) será inaugurada no dia 29 de dezembro". Metrô CPTM (in Portuguese). Retrieved 14 December 2021.
- "Serra dá início às obras de prolongamento da Linha 2-Verde". Governo do Estado de São Paulo. 23 November 2009. Retrieved 14 December 2021.
- Peters, Cristián (17 April 2019). "Sacyr construirá estação do monotrilho de SP". Construção Latino Americana. Retrieved 14 December 2021.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.
.jpg.webp)