Line 4 (Chongqing Rail Transit)

Line 4 of Chongqing Rail Transit is a rapid transit line in Chongqing, China.[2]

Line 4
4
Toutang Station platform
Overview
Native name重庆轨道交通4号线
StatusOperational
Line number4
LocaleChongqing, China
TerminiMin'an Ave.
Tangjiatuo
Stations8
Service
TypeRapid transit
SystemChongqing Rail Transit
Operator(s)Chongqing Rail Transit (Group) Co., Ltd.
History
Opened28 December 2018 (2018-12-28)
Technical
Line length15.7 km (9.8 mi)[1]
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in)
Electrification1500 V DC Overhead line
Route map

Panguilu
Shimahe Interchange
Yudaishan
Panxi
Loop line (ACW)
Dashiba
Daqingcun
Huahuiyuan
Longxi
Jiazhoulu
Min'an Ave.
Loop line (CW)
Chongqing N.
Station N. Square
Line 10 to Lanhualu
Line 10 to Wangjiazhuang
Toutang
Line 9 to Xinqiao
Baoshuigang
Line 9 to Huashigou
Cuntan
Heishizi
Gangcheng
Taipingchong
Tangjiatuo Depot
Tangjiatuo
Tieshanping
Tongluo Mts.
Ganbazi
Fuhong Ave.
Yuzui
Yumiaolu
Gaoshikan
Fusheng
Wangjiacheng
Shengjibao
Longxing
Gaoshita
Pufu
Tongzilin
Shichuan South
Shichuan
Shichuan Depot

Since June 2020, some rapid trains through operate from Line 4 into the Loop line.[3]

Opening timeline

SegmentCommencementLengthStation(s)Name
N. Square of Chongqing N. Railway Station Tangjiatuo 28 December 2018 15.7 km[1] 7 Phase I
Min'an Ave. N. Square of Chongqing N. Railway Station 11 January 2019 1

Stations

Phase I

Phase I is 15.754 km in length (underground section is 11.075 km, elevated section is 4.679 km).[1]

In June 2018, debugging of the first segment of Phase I commenced.[4] Phase 1 of Line 4 began operating on December 28, 2018.

Service
routes
Station
Station name Connections Distance
km
Location
E L English Chinese
through-service to/from Chongqing Library via Loop line
4/01 Min'an Ave. 民安大道 Loop Yubei
4/02 Chongqing North Station (North Square)[lower-alpha 1] 重庆北站北广场 10
4/03 Toutang 头塘 9 Jiangbei
4/04 Baoshuigang 保税港 9
4/05 Cuntan 寸滩
4/06 Heishizi 黑石子
4/07 Gangcheng 港城
4/08 Taipingchong 太平冲
4/09 Tangjiatuo 唐家沱

Gangcheng station has not been opened yet.

Phase II

Phase II is 32.8 km in length with 15 stations (10 underground stations and 5 elevated stations).[5]

Station
No.
Station name Connections Distance
km
Location
English Chinese
Tieshanping 铁山坪 Jiangbei
Ganbazi 干坝子
Fuhong Ave. 福宏大道
Yuzui 鱼嘴
Yumiaolu 鱼庙路
Gaoshikan 高石坎
Fusheng 复盛 Yubei
Wangjiacheng 王家城
Shengjibao 生基堡
Longxing 龙兴
Gaoshita 高石塔
Pufu 普福
Tongzilin 桐梓林
Shichuan South 石船南
Shichuan 石船

Phase III

The Western extension of Line 4 started construction in March 2021. It will add 9 more stations west of Min'an Ave. station. The extension is 11 km in length.[6]

Notes

  1. The former translation is North Square of Chongqingbei Railway Station, which has been changed since the opening of the Line 10's station

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.