Panyu Square station

Panyu Square station (Chinese: 番禺广场站) is a station of Line 3 and Line 18 of the Guangzhou Metro. Line 3 started operation on 30 December 2006 and Line 18 started operation on 28 September 2021. It will be an interchange station between Line 3, Line 18, and Line 22 in late 2021.

Panyu Square

番禺广场
Chinese name
Simplified Chinese番禺广场站
Traditional Chinese番禺廣場站
General information
LocationPanyu District, Guangzhou, Guangdong
China
Operated byGuangzhou Metro Co. Ltd.
Line(s)     Line 3
     Line 18
     Line 22 (U/C)
Platforms6 (3 island platforms)
Tracks6
Construction
Structure typeUnderground
Disabled accessYes
History
Opened30 December 2006 (Line 3)
28 September 2021 (Line 18)
Late 2021 (Line 22)
Services
Preceding station   Guangzhou Metro   Following station
TerminusLine 3
toward Xiancun
Line 18
Hengli
toward Wanqingsha

The station is located under the junction of Donghuan Road (东环路) and East Qinghe Road (清河东路) in the Shiqiao Subdistrict, in Panyu District, Guangzhou.[1] Panyu Square is a newly developed area to the south of Shiqiao, surrounded by the new Panyu District Government Building (新番禺区政府大楼), hotel and high-rise buildings.[2][3]

Station layout

G Street level Exit
L1
Concourse
Lobby Customer Service, Shops, Vending machines, ATMs
L2
Equipment Area
- Station equipment
L3
Platforms
Platform 1  3  termination platform
Island platform, doors will open on the left
Platform 2  3  towards Tianhe Coach Terminal (Shiqiao)

Exits

Exit number Exit location
Exit A Qinghe Donglu
Exit C Qinghe Donglu
Exit D Qinghe Donglu

References

  1. Panyu Square
  2. "Introduction of Metro Line 3". Archived from the original on 2008-10-04. Retrieved 2008-12-16.
  3. Panyu Metro Stop

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.