Train Express Regional Dakar-AIBD

The Train Express Regional (TER) [1] is airport rail link in Senegal that connects Dakar with the Blaise Diagne International Airport.[2][3] It will be built by French companies Engie and Thales Group. The contract is valued at €2 billion.

Train Express Régional
The TER in Dakar station
Overview
LocaleDakar, Senegal
Transit typeCommuter rail, airport rail link
Number of lines1
Number of stations14
Technical
System length55 km (34 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz OHLE

Travel time between the city and the airport is expected to be under 50 minutes. The Train Express Régional will serve 14 stations on a 55 km route. Ridership is estimated at 115 000 passengers/day. The rolling stock will consist of 15 four-car Alstom's Coradia Polyvalent dual-mode multiple units.[4]

The line will be built in two stages, with the first covering 36 km from the city of Dakar to Diamniadio, while the second stage covering 19 km more to the airport. Construction began in the third quarter of 2016 and is expected to be completed in 2021.[5] The line was inaugurated by President Macky Sall on January 14, 2019 but has yet to enter operational service.[6]

Stations

Dakar railway station

Rolling Stock

  • 15 four-car Coradia Polyvalent trainsets[8] The trainsets are mainline dual-mode trains (diesel and electric 25 kV) capable of running at speeds of 160 km/h. Each trainset is 72 metres long with four cars and has capacity for 531 passengers in two classes (first and second).[9]

Parameters

  • Length: 54 km [10]
  • Stations: 14
  • Lines: 1
  • Gauge: 1,435 mm (4 ft 8+12 in)
  • Voltage: 25 kV AC
  • Train size: 4
  • Fleet size: 15
  • Max speed: 160 km/h

See also

References


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.