Calcutta Chord link line

The Calcutta Chord link line, also known as the C.C. link line, is a 22 km (14 mi) long branch line of the Kolkata Suburban Railway which comes under the jurisdiction of Eastern Railway's Sealdah Division & Howrah Division.[1][2]

Calcutta Chord link line
(incl. A.C.C. link branch line)
Dankuni railway station, terminal station in Chord Link line
Overview
StatusOperational
OwnerIndian Railway
LocaleWest Bengal
TerminiSealdah
Dankuni Junction
Stations
  • Total stations:15
  • Interchange stations: 8
WebsiteEastern Railway
Service
TypeCommuter rail
SystemKolkata Suburban Railway
Operator(s)Eastern Railway
Depot(s)Sealdah
Daily ridership0.291 Million
History
Opened1932 (1932)
Technical
Line length22 km (14 mi)
Number of tracks2
CharacterAt grade, elevated
Track gauge5 ft 6 in (1,676 mm) broad gauge
Electrification25 kV overhead line
Operating speedup to 100 km per hour
Route map

km
km
14
0
Andul
2
Maurigram
11
Bankranayabaz
9
Baltikuri
A.C.C. Link
branch line
Dankuni
0
Bhattanagar
6
Rajchandrapur
4
4
Belanagar
Bally Halt
6
7
Bally
PWD Road
7
Bally Ghat
PWD Road
9
0
Dakshineswar
10
1
Baranagar Road
Noapara
2
Noapara Metro Depot
Kestopur Canal
15
4
Dum Dum Junction
Belgachia
6
17
Patipukur
Ultadanga Road
18
Kolkata
19
Kestopur Canal
Bidhan Nagar Road
18
Bidhannagar Road
Kankurgachi Road
2
Kankurgachi Road Junction
Narkeldanga
EMU Carshed
3
Sir Gurudas Banerjee Halt
Circular Canal
Kankurgachi
Chord line
Sealdah North
00
0
Sealdah Main
Sealdah
Sealdah South
00
Beliaghata Diesel Loco Shed
6
Kamardanga Halt
3
7
Park Circus
km
km
Key
Indian Railways broad gauge (1676 mm)
Kolkata Metro (KM) broad gauge (1676 mm)
Kolkata Metro (KM) standard gauge (1435 mm)
in use │
out of use, planned, or
under construction (u/c)
│ tunnel

The line directly connects the Sealdah railway station (erstwhile Calcutta railway station) on the east bank of the Hooghly River with the Howrah–Bardhaman chord line at the Dankuni Junction on the west bank of the Hooghly River via the Vivekananda Setu. The Andul Calcutta Chord link line (known as the A.C.C.L. line) is a 9 km (5.6 mi) long branch line from Dankuni Junction which connects C.C. link line with the Santragachi–Amta branch line and Andul on the Howrah–Kharagpur line.[1][2][3]

History

The Howrah-Bardhaman Chord, a shorter link to Bardhaman from Howrah than the Howrah-Bardhaman Main Line, was constructed in 1917. In 1932, the Calcutta Chord Link Line was built over the Willingdon Bridge (now known as Vivekananda Setu) joining Dum Dum with Dankuni and opened for freight traffic, thus forming a direct link from Calcutta (now known as Sealdah railway station) to Dankuni on the Howrah-Bardhaman Chord, thus earning the line it's name.[4][5]

By 1950-51, Santragachi was heavily congested causing delays in arrival for trains bound to Howrah.[6] Two major reasons identified for the congestion were it's railway yard outstripping it's capacity and passing of freight trains of the South Eastern Railway from Kharagpur towards Chitpur and Kolkata docks taking the circuitous route via Tikiapara, Liluah, Belanagar and then finally taking the Calcutta Chord link line to Calcutta.[6]

To resolve the congestion problem, Indian Railways sanctioned the remodelling of the Santragachi railway yard in November 1962 and sanctioned the building of a direct link from Andul on the Howrah-Kharagpur line to the Calcutta Chord link line in the railway budget of 1959-60. This was to reduce the distance between Andul and Calcutta Chord from 27.5 km (17.1 mi) to 13 km (8.1 mi).[6]

The work of building the line however progressed slowly due to land acquisition problems and was finally completed on December 1968.[6] The electrification of the line was started subsequently and was completed by 1971-72.[7][8]

The ACCL line was primarily used by freight trains to bypass the congested sections near Howrah and directly connected the Eastern railway and South Eastern railway zones. However with increasing public demand, some long distance passenger trains were started in this section directly via Sealdah like the Sealdah–Puri Duronto Express in 2012.[9]

Electrification and track doubling

The Dum Dum-Dankuni section was electrified in 1964-65. The Andul-Dankuni section was electrified in 1971-72.[8]

The doubling of the Dankuni-Bhattanagar section of the ACCL line was sanctioned on 2013.[10] The track doubling of the Andul-Baltikuri section was completed & commissioned on 25 January 2020.[11] With the completion of the track doubling of Baltikuri-Bhattanagar section on October 2021, the entire ACCL line was doubled. This removed a critical bottleneck affecting interchange of trains between Eastern Railway and South Eastern Railway.[12]

Routes and stations

Main line

Calcutta Chord link line
# Distance from Sealdah (km) Station name Station code Connections
10SealdahSDAHEastern line / South lines
24Bidhannagar RoadBNXREastern line / Circular line
37Dum Dum JunctionDDJEastern line / Circular line
412Baranagar RoadBARNNone
513DakshineswarDAKENone
615Bally GhatBLYGNone
716Bally HaltBLYHNone
817RajchandrapurRCDNone
922Dankuni JunctionDKAEEastern line

Branch line

Andul Calcutta Chord Link branch line (ACCL branch line)
# Station name Station code Connections
1Dankuni JunctionDKAEEastern line
2RajchandrapurRCDEastern line
3BhattanagarBTNGNone
4BaltikuriBALTSouth Eastern line
5BankranayabazBKNMSouth Eastern line
6AndulADLSouth Eastern line

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.