Line S5 (Nanjing Metro)

Line S5[1] is a planned rapid transit line connecting Nanjing and Yangzhou. It will be 57.61 kilometres (35.80 mi) long and have a maximum operating speed of 160 kilometres per hour (99 mph).[2]

Line S5
 S5 
Overview
Other name(s)Nanjing–Yangzhou intercity railway
Nanjing–Yizheng–Yangzhou intercity railway
StatusPlanned
LocaleNanjing and Yangzhou, Jiangsu Province
TerminiXianlinhu
Yangzhou West Railway Station
Stations16
Service
TypeRapid Transit
SystemNanjing Metro
Operator(s)Nanjing Metro
Rolling stock4-car Type A
Technical
Line length57.61 km (35.8 mi)
CharacterElevated and underground
Track gauge1,435 mm (4 ft 8+12 in)

Construction is expected to begin in 2021. It is planned to open in 2026.[2]

Stations

Service Routes Station Name Connections Distance
km
Location
English Chinese
Xianlinhu 仙林湖  4 
Qixia 栖霞
Dongyangjie 东阳街
Gangchenglu 港城路
Huayuan 花园
Longtan 龙潭
Longtan East 龙潭东
Jing'an 靖安
Wannianlu 万年路
Gongnonglu 工农路
Tianningdadao 天宁大道
Yizhengkaifaqu 仪征开发区
Puxi 朴席
Chahe 汊河
Zhannanlu 站南路
Yangzhou West Railway Station 扬州西站

There will be two service patterns: an all-stops service that takes 45 minutes and an express service that only calls at Longtan, Gongnonglu, and Chahe, that will take 34 minutes.[2]

References

  1. "宁扬S5号线首次环评公示". Sina (in Chinese). 2018-02-12. Retrieved 2021-08-08.
  2. "34分钟扬州至仙林!宁扬城际计划年底开建2026年通车" [34 minutes from Yangzhou to Xianlin! Nanjing-Yangzhou intercity railway planned to start construction by the end of this year and open in 2026.]. 人民网 (in Chinese). 2021-08-08. Retrieved 2021-08-08.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.