Line 3 (Hangzhou Metro)
Line 3 of the Hangzhou Metro (simplified Chinese: 杭州地铁三号线; traditional Chinese: 杭州地鐵三號線; pinyin: Hángzhōu Dìtiě Sānhào Xiàn) is a subway line under construction.[3][4] The line will be 57.5 km long[2] and will run in a southwest-northeast direction between Wushanqian station in Yuhang District and Xingqiao station[1] in Linping District in the east, passing through downtown Hangzhou and providing transfers with multiple other lines in the system. Phase 1 of the line is expected to be operational by 2022.[2] The line will use higher capacity six car type AH subway cars.[5]
| Line 3 | |
|---|---|
| 3 | |
| Overview | |
| Status | Under construction |
| Owner | City of Hangzhou |
| Locale | Hangzhou, China |
| Termini | Xingqiao[1] Wushanqian / Shima[1] |
| Stations | 39[2] |
| Service | |
| Type | Rapid transit |
| System | Hangzhou Metro |
| Services | 2 |
| Operator(s) | Hangzhou Metro Corporation |
| Depot(s) | Xingqiao Depot Xiaoheshan Stabling Yard Cangqian Depot |
| Rolling stock | 6 cars, type AH |
| History | |
| Planned opening | 2022 |
| Technical | |
| Line length | 57.5 km (35.73 mi)[2] |
| Character | Underground |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Electrification | Overhead, 1,500 V DC |
| Operating speed | 80km/h (50mph) |
Service routes
- Wushanqian — Xingqiao
- Shima — Xingqiao
Stations

Line 3 drawn to scale.
| Service routes |
Station name | Connections | ||||||
|---|---|---|---|---|---|---|---|---|
| English[6] | Chinese[1] | |||||||
| ● | Shima | 石马 | ||||||
| ● | Xiaoheshan | 小和山 | ||||||
| ● | Pingfeng | 屏峰 | ||||||
| ● | Liuxia | 留下 | ||||||
| ● | | | Wushanqian | 吴山前 | |||||
| ● | | | Liuxiang Road | 留祥路 | |||||
| ● | | | West Railway Station | 杭州西站 | Airport | ||||
| ● | | | Longzhou Road | 龙舟路 | |||||
| ● | | | West Wenyi Road | 文一西路 | |||||
| ● | | | Lvting Road | 绿汀路 | 5 16 | ||||
| ● | | | Chuangming Road | 创明路 | |||||
| ● | | | Quanfeng | 全丰 | |||||
| ● | | | Gaojiao Road | 高教路 | |||||
| ● | | | Liansheng Road | 联胜路 | |||||
| ● | | | Hongyuan | 洪园 | |||||
| ● | ● | South Xixi Wetland | 西溪湿地南 | |||||
| ● | ● | Huawu | 花坞 | |||||
| ● | ● | Dongyue | 东岳 | |||||
| ● | ● | Gudun Road | 古墩路 | |||||
| ● | ● | Gudang Xincun | 古荡新村 | |||||
| ● | ● | Gudang | 古荡 | |||||
| ● | ● | Huanglong Sports Center | 黄龙体育中心 | 10 | ||||
| ● | ● | Huanglong Cave | 黄龙洞 | |||||
| ● | ● | Wulinmen | 武林门 | 2 | ||||
| ● | ● | Wulin Square | 武林广场 | 1 | ||||
| ● | ● | West Lake Cultural Square | 西湖文化广场 | 1 Airport | ||||
| ● | ● | Chaowang Road | 潮王路 | |||||
| ● | ● | Xiangji Temple | 香积寺 | |||||
| ● | ● | Daguan | 大关 | |||||
| ● | ● | Shanxian | 善贤 | 5 | ||||
| ● | ● | Xintiandi Street | 新天地街 | 4 | ||||
| ● | ● | Qilun Square | 汽轮广场 | |||||
| ● | ● | Huafeng Road | 华丰路 | |||||
| ● | ● | Tongxie Road | 同协路 | |||||
| ● | ● | Taohuahu Park | 桃花湖公园 | |||||
| ● | ● | Dingqiao | 丁桥 | |||||
| ● | ● | Huahe Street | 华鹤街 | |||||
| ● | ● | Huangheshan | 黄鹤山 | |||||
| ● | ● | Xingqiao | 星桥 | |||||
See also
References
- "杭州市人民政府关于杭州地铁3号线一期工程车站站名及地铁5号线"香积寺路站"更名的批复".
- "杭州地铁3号线最新进展:一期工程香积寺路站主体结构封顶 全线预计2021年年底建成". 2019-10-30.
- "杭州地铁3号线一期年底开工". ZJNews. 14 July 2017.
- "工可报告通过评审 地铁3号线一期"上马在即" 预计今年开工,力争亚运会前建成". Hangzhou Daily. 2 March 2017.
- "省发展改革委关于杭州地铁3号线一期工程初步设计的批复". www.zjdpc.gov.cn. Archived from the original on 2018-02-10. Retrieved 2019-02-08.
- "Photo of official map".
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.