Line 9 (Hangzhou Metro)
Line 9 of the Hangzhou Metro (simplified Chinese: 杭州地铁九号线; traditional Chinese: 杭州地鐵九號線; pinyin: Hángzhōu Dìtiě Jiǔhào Xiàn) is a subway line. The line is 29.45 km (18.30 mi) long and runs in a north–south direction between Guanyintang and Long'an.[2] The line is colored brown on system maps.
| Line 9 | |
|---|---|
| 9 | |
![]() Line 9 train | |
| Overview | |
| Status | Under construction Partially operational |
| Owner | City of Hangzhou |
| Locale | Hangzhou, Zhejiang |
| Termini | Guanyintang Long'an |
| Stations | 21 (11 in service) |
| Service | |
| Type | Rapid transit |
| System | Hangzhou Metro |
| Services | 1 |
| Operator(s) | Hangzhou Metro Corporation |
| Depot(s) | Changda Road Depot
Sibao Stabling Yard |
| Rolling stock | 6 cars, type B |
| History | |
| Opened | 10 July 2021 |
| Technical | |
| Line length | 12.5 km (7.8 mi) (in operation)[1] 29.45 km (18.30 mi) (full line) |
| Number of tracks | 2 |
| Character | Underground and Elevated |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Electrification | Overhead, 1,500 V DC |
| Operating speed | 80km/h (50mph) |

Line 9 drawn to scale.
Opening timeline
| Segment | Commencement | Length | Station(s) | Name |
|---|---|---|---|---|
| Coach Center — Linping | 24 November 2012 (as part of Line 1) 10 July 2021 (Line 9 commencement)[3] |
12.5km[1] | 7 | Central section of Phase 1 |
| Linping — Long'an | 17 September 2021[4] | 6.2 km[5] | 4 | North section of Phase 1 |
| Guanyintang — Coach Center | 10 | South section of Phase 1 |
Stations
- Legend
- Operational
- Under construction
| Section | Station name[2] | Connections | Location | |
|---|---|---|---|---|
| English | Chinese | |||
| South | Guanyintang | 观音塘 | 7 | Shangcheng |
| Xinye Road | 新业路 | |||
| Qianjiang Road | 钱江路 | 2 4 | ||
| Jianghehui | 江河汇 | |||
| Sanbao | 三堡 | 6 | ||
| Yudao | 御道 | Airport | ||
| Wubao | 五堡 | |||
| Liubao | 六堡 | |||
| South Hongpu Road | 红普南路 | |||
| Jiumu Road | 九睦路 | |||
| Central | Coach Center | 客运中心 | 1 | Shangcheng |
| South Qiaosi | 乔司南 | Linping | ||
| Qiaosi | 乔司 | |||
| Wengmei | 翁梅 | |||
| Linping South Railway Station | 余杭高铁站 | Hangzhou–Haining | ||
| Nanyuan | 南苑 | |||
| Linping | 临平 | |||
| North | Qiushan Avenue | 邱山大街 | Linping | |
| Heyu Road | 荷禹路 | |||
| Wuzhou Road | 五洲路 | |||
| Long'an | 龙安 | |||
See also
References
- "喜讯!众合科技助力杭州地铁9号线临平段改造工程圆满完成". 2021-07-15.
为9号线的中段,由既有1号线临平支线拆分独立运营构成,长约12.5公里
- "杭州市人民政府关于杭州地铁4号线二期工程、8号线一期工程、9号线一期工程车站站名的批复" (in Chinese). 2021-03-11.
- "7月10日起,杭州地铁9号线来了!". 2021-07-07.
- "明天下午3时 杭州地铁9号线北段和7号线市民中心站正式开通". 2021-09-16.
- "杭州地铁9号线北段即将开通 带你提前探营". 2021-09-09.
线路全长约6.2km
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.
