Zhangjiang Tram

Zhangjiang Tram is one of the only two tram networks operating in Shanghai today, the other being Songjiang Tram. It utilises a system manufactured by the French Translohr company. Shanghai originally had a steel wheeled electric tramway network in its urban center. Routes expanded gradually and reached largest extent in 1925 with 328 tramcars; this tram system shut down in 1975. Tram service returned to Shanghai with the opening of a rubber tired Translohr line in the suburban Zhangjiang Hi-Tech Park in 2010. It is the second rubber-tired tram system in both China and Asia, the first being TEDA tram in Tianjin.

Zhangjiang Tram
Overview
StatusOperational
LocalePudong, Shanghai
TerminiZhangjiang metro station
Zhangdong Road Jinqiu Road Station
Connecting lines 2 
Stations15
Service
TypeLight rail
SystemZhangjiang Tram
Services ZJ : Zhangjiang metro station ↔ Zhangdong Road Jinqiu Road Station
Operator(s)Shanghai Pudong Modern Rail Transportation Co., Ltd
Depot(s)Heqing Town
Rolling stock9 3-car Translohr rubber-tired tram
Daily ridership6,000 (daily average, 2016)[1]
History
CommencedDecember 23, 2007 (2007-12-23)
OpenedDecember 31, 2009 (2009-12-31)
Technical
Line length9.8 km (6 mi)
CharacterAt-grade, unreserved tracks in the middle of the road
Track gaugeNone, central guide rail
ElectrificationOverhead lines (550 volts) DC
Operating speed40 km/h (25 mph)
Route map
Route on the Shanghai map:
To scale geographic map:

Zhangjiang Tram started construction on December 23, 2007.[2] Construction was originally planned to be completed in December 2008, but this was delayed a year, until December 31, 2009 when it was opened to traffic.[3] Passenger operations started on December31, 2009. Zhangjiang Tram runs for 10 km (6.2 mi) from Zhangjiang Hi-Tech Park Station of the Shanghai Metro Line 2 to Heqing Town with 15 stops.

Zhangjiang tram was planned to be built in phases. The first phase is constructed and runs from Zhangjiang Hi-Tech Park Station on Shanghai Metro Line 2 (formerly Songtao Road Zuchongzhi Road Station) in the east, to Zhangdong Road Jinqiu Road Station in the west, which covers a distance of 9.8km, with a total of 15 stops, 1 depot. Initial plans included a next phase which is an extension to Tangzhen.

History

The new system was built in Zhangjiang Town, because it is a planned area, and commuting between neighborhoods of the town has always been difficult. The Translohr tramway is constructed in Zhangjiang Town which is in the heartland area of Pudong New Area (east shore of Huangpu River). Due to Economic-Technological Development Area ordinances, sound pollution must be kept to a minimum in this area. Traditional steel-wheeled trams generate much vibration and sound during their journey. Rubber tires on the trams reduce vibration, and as a result noise, substantially. Additionally, the Zhangjiang Town roads are very hilly, and rubber tired trams can more easily climb steeper grades than traditional trams. Another advantage is that rubber-tired trams don't require tracks, as steel wheeled cars do, so there is less disturbance of underground networks like power cables, phone lines, and sewer and water mains.

Timeline

  • 2007 – Construction of rubber tired tram started.
  • 2009 – Test runs occurred.
  • 2010 – Commercial services began.

Stations

The modern tram runs from Zhangjiang Hi-Tech Park Station to Zhangdong Road Jinqiu Road Station. All stops have island platforms.

Routes Station name Connections Distance
km
Location
M English Chinese
Zhangjiang metro station 张江地铁站  2  Zhangjiang Hi-Tech Park Station 0.00 0.00 Pudong
Bibo Road Gaoke Road Station 碧波路高科路站
Huatuo Road Daerwen Road Station 华佗路达尔文路站
Huatuo Road Keyuan Road Station 华佗路科苑路站
Cailun Road Jinke Road Station 蔡伦路金科路站
Cailun Road Halei Road Station 蔡伦路哈雷路站
Gebaini Road Libing Road Station 哥白尼路李冰路站
Ziwei Road Gaosi Road Station 紫薇路高斯路站
Gaosi Road Zhangjiang Road Station 高斯路张江路站
Zhangjiang Middle School Station 张江中学站
*Guanglan Road Zuchongzhi Road Station 广兰路祖冲之路站  2  Guanglan Road
Guanglan Road Dangui Road Station 广兰路丹桂路站
Dangui Road Qingtong Road Station 丹桂路青桐路站
Dangui Road Zhangdong Road Station 丹桂路张东路站
Zhangdong Road Jinqiu Road Station 张东路金秋路站 9.8

Practical Info

  • Total length – 9.8km.
  • Opened – December 31, 2009.
  • Operating hours – 5:45 am to 11 pm.
  • Frequency – 15 minutes (3 minutes before end of 2015).[4]

Fleet

The rolling stock is Translohr. It consists of 9 multiple units of three cars each. They are low floor, fully air conditioned, and can operate at high speeds.

Features

Most Zhangjiang tram lines run along the centre of the roads, while some stations are situated at intersections and have side platforms, while the two terminals have a central platform. Zhangjiang streetcar doors are on a "Request stop" mode. If a passenger requests a stop, a green light is illuminated and the doors open at the next stop. If no stop is requested, the doors remain closed.

Depots and termini

Zhangjiang Hi-Tech Park Station and Zhangdong Road Jinqiu Road Station are the two termini of the Zhangjiang Tram line. Trams are stored in an indoor facility at the eastern end of the line in Heqing Town.

Alignment

The modern tram routes completely run on unreserved tracks and in the middle of the road. Because of the rubber tires, it is not possible to lay track in grass, as the trams can only run on concrete or paved roads.

Tickets

There is a single fare of 2 Yuan.

See also

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.