Manila Metro Rail Transit System
The Manila Metro Rail Transit System (MRTS or MRT) is one of the two rapid transit systems serving Metro Manila in the Philippines along with the Manila Light Rail Transit System (LRTS). It originally began as a single line (Line 3) that was first opened in 1999 and became fully operational by the year 2000. Since then, most of the newly proposed rapid rail lines within Metro Manila that are not under the jurisdiction of the Light Rail Transit Authority is associated with the "MRT" brand. This includes the Metro Manila Subway (Line 9) and the elevated Line 7 which are being built as of January 2020.
![]() Line 3 in 2019. It remains the only operational line in the system as of 2020. | |||
| Overview | |||
|---|---|---|---|
| Owner | Government of the Philippines | ||
| Area served | Metro Manila Central Luzon | ||
| Transit type | Rapid transit | ||
| Number of lines | 1 (operational) 2 (under construction) 8 (planned) | ||
| Number of stations | 13 (present) 145 (planned) | ||
| Operation | |||
| Began operation | 1999 (3) | ||
| Operation will start | 2022 (7, MMS ) 2025 (4, 5) | ||
| Operator(s) | Department of Transportation Makati (5) | ||
| Technical | |||
| System length | 16.9 km (10.5 mi) (operational) 373 km (232 mi) (planned) | ||
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
| Minimum radius of curvature | Line 3: 370 m (1,210 ft) (Mainline) 28 m (92 ft) (Depot) | ||
| Electrification | Overhead lines (3, MMS ) Third rail (7) | ||
| Average speed | 40 km/h (25 mph) | ||
| Top speed | 80 km/h (50 mph) | ||
| |||
Network
There is currently only one light metro/light rail line in operation but there are three heavy rail lines under construction. In recent years, there are proposals to extend the system. The system is intended to have seven lines as of 2019, with at least 49 stations across 124.4 kilometers (77.3 mi) of track. Until 2019, almost all proposed lines were given odd numbers.
| Line number and color | Opened | Last extension | Termini | Stations | Type | Length | |
|---|---|---|---|---|---|---|---|
| Line 3 | December 15, 1999 | — | North Avenue | Taft Avenue | 13 | Light rail | 16.9 km (10.5 mi) |
| Line 4[1] | 2025[2] (projected) | — | N. Domingo | Taytay | 11 | Monorail | 15.5 km (9.6 mi) |
| Makati Subway[3][4][5] | 2025[6] (projected) | — | Amorsolo | Sampaguita | 13 | Heavy rail | 11 km (6.8 mi) |
| Line 7[7][8] | 2022[9] (projected) | — | North Triangle Common Station | San Jose del Monte | 14 | Heavy rail | 22.8 km (14.2 mi) |
| Metro Manila Subway[10] | 2026[11] (projected) | — | East Valenzuela | Bicutan | 15 | Heavy rail | 36 km (22 mi) |
| Lines and stations in italics are either under construction, not yet operational, or have been closed. | |||||||
Not included is MRT Line 7's proposed circumferential–radial network, as well as Lines 8, 10,[12][13][14] and 11.[15] These are still awaiting approval as of 2021.
Network map
References
- Flores, Mikhail Franz E. (June 16, 2015). "Major infrastructure projects lined up". BusinessWorld. Retrieved July 6, 2015.
- Subingsubing, Krixia (January 10, 2020). "MRT 4 project targeted for completion in 2025". Inquirer.net. Archived from the original on June 21, 2020. Retrieved July 13, 2021.
- Magano, Louie (July 27, 2018). "The Makati Subway". ABS-CBN News. Retrieved September 19, 2018.
- Lagrimas, Nicole-Anne C. (August 22, 2018). "Makati City, IRC consortium likely to break ground for subway project by year-end". GMA News Online. Retrieved September 19, 2018.
- Esguerra, Darryl John (August 23, 2018). "Construction of Makati City subway system to start in December". Inquirer.net. Retrieved September 19, 2018.
- Lagrimas, Nicole-Anne C. (August 22, 2018). "Makati City, IRC consortium likely to break ground for subway project by year-end". GMA News Online. Archived from the original on September 19, 2018. Retrieved September 19, 2018.
- Cruz, Neal. (November 14, 2007). "MRT 7 may end Metro traffic problems". Philippine Daily Inquirer. Archived from the original on June 28, 2009. Retrieved March 14, 2009.
- "Marubeni to build $1B Philippine rail project". Inquirer.net. Agence France-Presse. May 15, 2012.
- "MRT-7 more than 50% complete, set to open by Dec. 2022". CNN Philippines. February 19, 2021. Archived from the original on July 13, 2021. Retrieved February 20, 2021.
- "DOTr eyes Feb. 27 Metro Manila subway launch". Manila Bulletin News. February 16, 2019. Retrieved February 16, 2019.
- "DOTr says Metro Manila Subway will be flood-proof". Inquirer.net. September 5, 2020. Archived from the original on September 22, 2020. Retrieved December 5, 2020.
- de Vera, Ben O. (November 18, 2019). "Tycoons' unsolicited PPP projects bolster "Build, Build, Build"". Inquirer.net. Retrieved December 22, 2019.
- "C5 MRT 10 Project". Public-Private Partnership Center. Retrieved December 22, 2019.
- Ordinario, Cai (October 1, 2018). "NEDA reviews proposal for MRT 10, 2 other infrastructure projects". BusinessMirror. Retrieved December 22, 2019..
- "MRT-11 project". www.ppp.gov.ph. Public-Private Partnership Center. Retrieved October 31, 2020.
.jpg.webp)