Wuhu Rail Transit
Wuhu Rail Transit is a two-line monorail rapid transit system in Wuhu, Anhui, China. Both lines will use Bombardier Innovia Monorail trains manufactured under a joint venture with CRRC.[2] Line 1 opened on November 3, 2021, with line 2 expected to open by the end of 2021.[3]
![]() Line 1 and Line 2 | |
| Overview | |
|---|---|
| Locale | Wuhu, Anhui, China |
| Transit type | Rapid transit |
| Number of lines | 1 |
| Number of stations | 25 |
| Operation | |
| Began operation | November 3, 2021[1] |
| Technical | |
| System length | 30.4 km (18.9 mi) |
History
Line 1
Line 1 has been under construction since December 2016.[4]
On September 25, 2021, Wuhu Rail Transit Line 1 launched a monthly long trial with 10,000 passengers per week expected to test the line for free.[5]
Line 1 opened on November 3, 2021.[1]
Line 2
The first phase of Line 2 started construction in 2018.[6]
Stations and Description
.jpg.webp)
Line 1
| Station name | Connections | Distance km | |||
|---|---|---|---|---|---|
| English[7] | Chinese[7] | ||||
| Baoshunlu | 保顺路 | ||||
| Huashanlu | 华山路 | ||||
| Taishanlu | 泰山路 | ||||
| Hengshanlu | 衡山路 | ||||
| Longshanlu | 龙山路 | ||||
| Anshanlu | 鞍山路 | ||||
| Gangwanlu | 港湾路 | ||||
| Yu'anlu | 裕安路 | ||||
| Wuyishanlu | 武夷山路 | ||||
| Gangyilu | 港一路 | ||||
| Tianzhushanlu | 天柱山路 | ||||
| Tianmenshanlu | 天门山路 | ||||
| Chizhushanlu | 赤铸山路 | ||||
| Zheshanlu | 赭山路 | ||||
| Zheshangongyuan | 赭山公园 | ||||
| Zhongshanbeilu | 中山北路 | ||||
| Jiuziguangchang | 鸠兹广场 | 2 (U/C) | |||
| Huanchengbeilu | 环城北路 | ||||
| Aotizhongxin | 奥体中心 | ||||
| Honghuashanlu | 红花山路 | ||||
| Bolanzhongxin | 博览中心 | ||||
| Wenjindonglu | 文津东路 | ||||
| Henglangshanlu | 珩琅山路 | ||||
| Wuhunan Railway Station | 芜湖南站 | ||||
| Baimashan | 白马山 | ||||
Line 1 consists of 25 stations (all elevated stations) and 30.46 kilometres (18.93 mi)[8] of track between Baoshunlu station in the north and Baimashan station in the south.[7] It opened on November 3, 2021.[1]
Line 2 (Phase 1)
| Station name | Connections | Distance km | |||
|---|---|---|---|---|---|
| English[7] | Chinese[7] | ||||
| Wanchunhulu | 万春湖路 | ||||
| Mengxilu | 梦溪路 | ||||
| Huizhoulu | 徽州路 | ||||
| Haiyanlu | 海晏路 | ||||
| Zhengwuzhongxin | 政务中心 | ||||
| Yunconglu | 云从路 | ||||
| Shenshangongyuan | 神山公园 | ||||
| Wuhu Railway Station | 芜湖火车站 | ||||
| Shenshankou | 神山口 | ||||
| Wenhualu | 文化路 | ||||
| Jiuziguangchang | 鸠兹广场 | 1 | |||
The first phase of Line 2 runs between Wanchunhulu station to Jiuziguangchang station, with transfer to Line 1 at Jiuziguangchang station.[7] It consists of 11 stations and 15.787 kilometres (9.810 mi) of track.[9][10] It is also projected to be completed in 2021.
Planned
Line 2 (Phase 2)
The second phase of Line 2 is under planning and will be completed by 2025. It will extend Line 2 to Jiangbei railway station.[11]
References
- "11月3日11时起,芜湖市民可乘坐地铁1号线了". 2021-11-02.
- 江苏三六五网络有限公司. "高清|芜湖轨道交通1、2号线无人驾驶列车居然长这样?-芜湖365淘房". news.wh.house365.com. Retrieved 2018-04-08.
- "Wuhu City monorail maintenance contract awarded". International Railway Journal. 4 June 2021. Retrieved 4 July 2021.
- 江苏三六五网络有限公司. "高清|墩柱有了"身份证" 芜湖轨道交通1号线建设正酣-芜湖365淘房". news.wh.house365.com. Retrieved 2018-04-08.
- "安徽"第二城",即将进入轨道交通时代". Sina. 24 September 2021. Retrieved 2021-09-27.
- 江苏三六五网络有限公司. "芜湖轨道交通2号线建设又有新进展,"轨道交通时代"即将到来!-芜湖365淘房". news.wh.house365.com. Retrieved 2018-04-08.
- "官宣!芜湖市轨道交通1号线、2号线一期站名正式确定!".
- "最高时速80千米 芜湖单轨列车运行时间公布".
轨道交通1号线线路全长30.46千米,沿城市南北向敷设,共设高架站25座
- "轨道交通2号线一期进入全线调试阶段". 2021-06-07.
- "多图!芜湖轨道交通2号线最新进展曝光,赶紧来看!". www.sohu.com.
- "芜湖市城市轨道交通建设规划(2021-2025年)环境影响评价公众参与第一次公示". 2020-10-10.
